It has been more than 60 years since SYSTRA has garnered expertise that spans the entire spectrum of Mass Rapid Transit System. SYSTRA India’s valuable presence in India roots back to 1957, where SYSTRA worked on the electrification of Indian Railways. Our technical excellence, holistic approach and the tremendous talent provides a career that puts people who join us at the heart of improving transportation and urban infrastructure efficiency.
Understand better who we are by visiting www.systra.in
CONTEXT
In India, SYSTRA is an international consulting and engineering company operating in the fields of Metros, High Speed Rail, Railways, Roads, Buildings, Urban planning, and Water Infrastructure for public and private organizations. Our unique expertise is backed with a reputation built through technical excellence delivered on projects. Our fully integrated services are tailored to plan and manage projects using proven best practices.
SYSTRA’S SYSTEMS BUSINESS IN INDIA HAS DESIGN AND PROJECT MANAGEMENT CAPABILITIES IN THE SYSTEMS SPACE. EXPERTS IN RAILWAY EQUIPMENT, OUR TEAMS ARE EXPERIENCED IN CHOOSING THE BEST-ADAPTED SOLUTIONS TO EACH SITUATION WHILE MEETING VARIOUS REGULATORY STANDARDS.
SYSTRA HAS DETAILED DESIGN COMPETENCY IN INDIA IN THE POWER SUPPLY AND OVERHEAD LINES BUSINESS IN BOTH AC & DC TRACTION. WE HAVE ALSO CAPABILITIES OF DESIGNING AC & DC TRACTION, THIRD RAIL, POWER SUPPLY AND OHL. WE HAVE EXPERIENCE IN EXECUTING DOMESTIC AND SOME PRESTIGIOUS INTERNATIONAL PROJECTS.
ON THE ROLLING STOCK, SIGNALING, TELECOMMUNICATIONS, AFC, RAMS & OPERATIONS SIDE, SYSTRA INDIA IS EXECUTING SEVERAL DESIGN REVIEW AND DETAILED PROJECT REPORTS LIKE: MRVC-CBTC (MIGRATION OF EXISTING SUB-URBAN TRANSIT SYSTEM TO CBTC), BANGALORE METRO, KOLKATA METRO, PUNE METRO PHASE II, VIJAYAWADA MRTS AND DHAKA METRO LINE 5N.
PROJECT: APPOINTMENT OF GENERAL CONSULTANT (GC) FOR SYSTEM WORKS OF PART OF CORRIDOR OF METRO LINE 5 (THANE-BHIWANDI-KALYAN), METRO LINE 7A (ANDHERI (E) TO CSIA), METRO LINE 9 (DAHISAR (E) TO MIRA BHAYANDER) OF MUMBAI METRO RAIL PROJECT OF MMRDA.
We are seeking applications for the position of Environment Engineer-K3 for GC Mumbai Metro Line 5, 7A & 9-Systems
MISSIONS/MAIN DUTIES
Environment Engineer will be responsible for:
Conducting Environmental Impact Assessments (EIA)
Ensuring compliance with environmental regulations and acquiring necessary permits
Preparing and implementing Environmental Management Plans (EMP)
Monitoring air, water, noise, and waste during construction and operation
Promoting green practices and sustainability measures
Managing environmental documentation and reporting
Engaging with stakeholders and raising environmental awareness on-site
PROFILE/SKILLS
Education qualification - bachelor’s degree in environmental engineering (B.E./B.Tech), Civil Engineering with environmental specialization, or a related field (e.g., Environmental Science, Chemical Engineering).
Years of experience - 10+ Years
Prior experience requirement - Relevant work experience in infrastructure or metro projects will be added advantage.
Excellent written and oral English communication skills.
Ability to work within a culturally diverse organization, recognizing and respecting differences.
Ability to problem solve, especially in an integrated project delivery environment, applying industry best practices.
Self-motivated individual with outstanding leadership skills and the ability to influence without authority
Strong leadership skills, proven ability to lead a team effort & make independent decision and be a good troubleshooter
Certifications in EIA, ISO 14001 (Environmental Management Systems), or related areas will be added advantage.
We commit to put people who join us at the heart of improving transportation and urban infrastructure efficiency. As we are growing, this is time to be a part of this challenging adventure. It’s not a job - it’s a career!