Home
Jobs

Posted:1 day ago| Platform: Linkedin logo

Apply

Work Mode

On-site

Job Type

Full Time

Job Description

Responsibilities

I.Strategic Accountability
  • Planning of DM Plant, FOPH, Compressor, Aux boiler, H2 generation, chlorination, PT plant, firefighting, CW SSF, HVAC plant schedule, resources, and materials. Plan & execute on Rolling quarterly basis in line with the relevant project schedule, monitor and control
II Operational Accountability
  • Monitoring and controlling of infrastructure requirement and erection schedule and resources, Project material requirements in line with the relevant project schedule
Verification of weekly & monthly MIS containing target, progress, constraints (Material, drawing resources) of the Turbine, Aux and piping.
  • Safety: - Implementation of safety management system Like, Preparation of Erection Methodology, JSA and Checklist & ensuing their implementation with zero harm.
Ensuring the implementation of the Audit Points of Safety by EPC Contractor
  • Quality:-Compliance of Field Quality Plan
Ensuring the implementation of the Audit Points of Quality
  • Contract Execution:- Milestone in the contract of DM Plant, FOPH, Compressor, Aux boiler, H2 generation, chlorination, PT plant, firefighting, CW SSF, HVAC plant.
Owner input, EPC Contractor Input, L-3/4 Preparation, Micro Plans.
Scope clarification to all concerned as per requirement.Communication with internal & external CustomersReporting progress and constrain (Time, Material, Resources), Propose of execute solutions for the constraint, presentation about system & progress.III People Development
  • Preparation of review of KRAs of members, counselling for sustained performance, Preparation of IDP as per individual needs and ensuring planned interventions.
IV Financial
1 Optimization of work execution & commissioning Time.
  • Shall be responsible for the Planning and Erection of DM Plant, FOPH, Compressor, Aux boiler, H2 generation, chlorination, PT plant, firefighting, CW SSF, HVAC plant as per erection schedule and resource Rolling Plan quarterly basis in line with the relevant project schedule follow up, Commissioning Co-ordination, Check List, and Standard Operating Procedure.
  • To verify weekly/monthly MIS( Materials, drawing, process, resources)
  • To ensure safety compliance at site. Review of JSA/HIRA, Erection Methodology and check list for erection, Compliance check list before taking up erection activity.
  • To coordinate (Progress, Material, drawing ,Resources) with PMCG/CEG & EPC Contactor
  • To ensure safety strict adherence to quality systems & Safety.
  • To co-ordinates for interface issues within inter & intra department

Qualifications

Age group:
35 - 40 yrsExperience Total : With Degree : 10-18YearsWith Diploma: 20 YearsWith PG : 12 YearsDesired Qualification: BE-MechanicalMust have sound knowledge of erection of DM Plant, FOPH, Compressor, Aux boiler, H2 generation, chlorination, PT plant, firefighting, CW SSF, HVAC plant including piping of at least 500 MW capacity unit.Should have good managerial & communication skills.

Mock Interview

Practice Video Interview with JobPe AI

Start Planning Interview Now
cta

Start Your Job Search Today

Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.

Job Application AI Bot

Job Application AI Bot

Apply to 20+ Portals in one click

Download Now

Download the Mobile App

Instantly access job listings, apply easily, and track applications.

coding practice

Enhance Your Skills

Practice coding challenges to boost your skills

Start Practicing Now
Adani Power
Adani Power

171 Jobs

RecommendedJobs for You

Singrauli, Madhya Pradesh, India

Raipur, Chhattisgarh, India