Job Purpose
To achieved targeted production of limestone with Safety, compliance of all statutory provisions and maintaining productivity. To coordinate shift operation, mining with non conventional methods like ripper dozer, surface mining, loading and transportation, HEMM operations etc. To lead mines operation team to meet the plant requirement of limestone production in terms of quality and quantity.Job Context & Major Challenges
Gujarat Cement Works is one of the single largest cement plants with an installed capacity to produce 6.5 million tons of cement /annum which is self-reliant on power having captive power plant (92 MW) ,two D. G. sets of 6 MW each , Mines & Captive Jetty, employing approximately 792 people. It manufactures a range of premium grades of cement for Export & Domestic market and enjoys a reputation of giving value for money. It is one of the largest cement plant at a single location in the country for export & import. Gujarat Cement Works has opted for the Best World Class Technology equipment right from its inception and it also has the desalination plant of capacity 2000 Cu m/day and associated RO plant The plant consists of 2 Lines, each having peak clinker production capacity of 8000 TPD.Talli Bambhor Limestone Mine having lease area of 193.3269 Hectare is one of the captive source for supplying Limestone to UltraTech Cement Plants based in Gujarat. It is an Open Cast Mining Project of Category ‘A’ With Eco friendly Non- Conventional methods of mining by using Surface Miner/Ripper Dozer technology for loosening the in-situ hard rock, without drilling & blasting. Top layer of Limestone is soft and friable in nature hence it is directly excavated by using excavator and loaded into tippers for transportation up to the Cement Plant. Production capacity of the mine is 0.53 MTPA as per Environment Clearance..Lease Mines is 90 km away from GCW plant and 30 km away from Mahuva town. There are another leases in the vicinity of 632.0064 Ha and 400.7236 Ha are yet to start. These leases are strategically important for supply of high grade limestone to our GCW cement plant. There are many local challages and political interefence in the region and need to handle intelligentaly for getting success.Key Result Areas
KRA (Accountabilities) (Max 1325 Characters)
Supporting Actions (Max 1325 Characters)
KRA1 Business Delivery To meet the plant requirement in both respect quality and quantity. 2) Proper maintanance of Records related to IBM,DGMS,GPCB etc and timely submission of retuns.KRA2 Performance and talent management To arrange training of subordinates, awarness to contractual employees and stackholders for delivering targeted production, productivity and quality are major matrix to achieve the goal.KRA3 Key systems & Process improvements/ Institutionalization Proper maintanance and daily updation of logbookof all equipments in mines,register,production,dispatch reports.Providing timely data for vendor billing.KRA4 Safety Ensuring and implementing various safety initiatives and drives by the managementKRA5 Annual Performance Improvement Project Proper vendor management. 9) Optimum utilization of available manpower and mining machinery.