Posted:1 week ago|
Platform:
Work from Office
Full Time
Should be cost estimations for Part and tooling including dies, Fixtures for Sheetmetal and Fabrication components for new developments and design changes. Part cost Estimations to be done at different stages of the project- Concept / Model based, Drawing based. Identify areas of cost reduction through design iteration to achieve the cost optimization at design stage itself. Study New existing manufacturing processes at supplier end to prepare Costing guidelines std estimation Templates. Qualifications B. Tech
Mahindra
Upload Resume
Drag or click to upload
Your data is secure with us, protected by advanced encryption.
Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.
We have sent an OTP to your contact. Please enter it below to verify.
Mohali
12.0 - 13.0 Lacs P.A.
7.0 - 11.0 Lacs P.A.
Mohali
17.0 - 19.0 Lacs P.A.
Kolkata, Mumbai, New Delhi, Hyderabad, Pune, Chennai, Bengaluru
14.0 - 15.0 Lacs P.A.
Bengaluru
14.0 - 19.0 Lacs P.A.
2.0 - 5.0 Lacs P.A.
Hosur
8.0 - 12.0 Lacs P.A.
12.0 - 16.0 Lacs P.A.
10.0 - 13.0 Lacs P.A.
17.0 - 19.0 Lacs P.A.