Primary Design Engineering - Pune/Chennai/Gurgaon

3 - 8 years

5 - 14 Lacs

Posted:1 week ago| Platform: Naukri logo

Apply

Work Mode

Work from Office

Job Type

Full Time

Job Description

Primary Design

Roles and Responsibilities

  • Work Execution with Lead Engineer/Manager
  • Basic Design Overall single line diagram, Protection & Metering SLD, LV AC/DC SLD, and Layout & Section Drawings.
  • Calculations Grounding calculation and basic mesh plan for outdoor and indoor, Lightning calculation and basic protection plan, Neutral Earthing conductor/cable calculation, CT/VT sizing calculation, Aus.TR sizing calculation, Emergency Diesel Generator sizing calculation, Battery/ Charger sizing calculation, Conductor sizing calculation, Sag Tension calculation, UPS/ Inverter sizing calculation, LV MCCB/MCB sizing calculation, HV/MV cable sizing calculation, LV cable sizing calculation with voltage drop, HV/MV cable support loading calculation, LV cable tray loading calculation, TR/Reactor oil pit sizing calculation, Outdoor/ Indoor lighting calculation and basic plan, Insulation coordination study etc.
  • Detailed Drawing BOM list of bulk materials like Earthing, Illumination, Lightning protection, AIS Conductor, Insulator, Hardware, and Clamps & Connectors, Cable, Cable trays, Steel structure etc.
  • Review/ Check all detailed drawings, Checklist & drawing for site survey, Review/ Comment for civil and building drawing, Erection Key BOM & diagram etc.
  • Review the contract documents and manage the engineering schedule for Substation projects.
  • Review the vendor drawings and evaluate offers for making a contract for Substation projects.
  • Review the approval documents and clients comments for Substation projects.
  • Manage the budget and Save the cost for Substation projects.
  • Lead the approval of documents and make a design concept for Substation projects.
  • Report the progress of engineering and plan a catch-up (if required).
  • Coordinate with site and vendor to meet the project schedules.
  • Have a meeting with vendor and client.
  • Review/ Comment on equipment type test report, FAT report and As-built drawings.
  • Support and solve the technical issues with other engineers.
  • Preparation of cable interconnection and termination schedule.
  • Knowledge on Substation system studies will have added advantage

Desired Candidate Profile

  • A Bachelor degree in Electrical Engineering or related discipline.
  • Experience in Power Plant and Substation field.
  • Minimum 2 to 6 years of Experience in Substation GIS Design.
  • MS-Office, Auto CAD, MS-Project

Perk & Benefit:

  • 5 Days Working
  • Flexible working
  • Meal Allowance

Work Location:

Mock Interview

Practice Video Interview with JobPe AI

Start Job-Specific Interview
cta

Start Your Job Search Today

Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.

Job Application AI Bot

Job Application AI Bot

Apply to 20+ Portals in one click

Download Now

Download the Mobile App

Instantly access job listings, apply easily, and track applications.

coding practice

Enhance Your Skills

Practice coding challenges to boost your skills

Start Practicing Now
Hyosung logo
Hyosung

Textile Manufacturing

RecommendedJobs for You

Kolkata, Mumbai, New Delhi, Hyderabad, Pune, Chennai, Bengaluru