Home
Jobs

PMC Site Engineer

4 - 9 years

2 - 4 Lacs

Posted:1 week ago| Platform: Naukri logo

Apply

Work Mode

Work from Office

Job Type

Full Time

Job Description

PMC Site Engineer Civil Construction - MGL


It's a 1 year of contract and further extendable candidate will be on our payroll i.e on M.M.K payroll. 


Construction Phase:

1) Day to day supervision of on-going construction of civil and electrical work as instructed

by MGL EIC.

2) Ensure that the contractor maintains proper labour force from time to time to complete

the specified departmental work and communicate the same to MGL EIC.

3) Assist MGL EIC in technical checking of the on-going work.

4) Estimate material requirements i.e., steel, cement, sand etc., for site activities.

5) Maintain curing records.

6) To ensure housekeeping at site.

7) Inspection of incoming materials like cables, electrical fixtures, Circuit breakers etc.,

ensuring it complies with MGL Technical Specifications.

8) Engineer shall carry out inspection of all Construction material received at site as per

approved QAP & Inspection checklist and accordingly certify/reject the material as

applicable.

9) Ensure that all the material brought to the site is as per construction drawing & contract

specification. Engineer shall obtain MTCs (Material Test Certificate), Delivery challans of

construction materials, etc., of all materials brought to site and shall record the same as

per instructions of EIC. The site supervisor shall also Verify & Certify material test

certificates received from contractor and maintain a record of TCs and Inspection reports.

10) Ensure preliminary preparation of different stages of work-related activities i.e., layout,

strata, RCC work, masonry work, plastering, painting, water proofing, plumbing etc.,

before commencement of new activity,

11) Supervision of construction activities as per contract agreement.

12) Certification and verification of joint measurement sheets which are recorded by

contractor along with MGL representatives.

13) Prepare progress chart.

14) Maintain daily and weekly reports format finalized by MGL EIC.

15) Follow up with contractor for execution of work as per given specifications/drawings or

as per MGL Engineer's instruction.

16) Detailed study of the specifications of the project, drawings etc.

17) To check the shuttering drawings prepared by contractor especially for the canopy

shuttering above 4.5m height.

18) Certify the material received at site against factory test certificate by verifying make

grade/ batch number, heat number etc.

19) Ensure workmanship of all items.

20) Ensure concrete cubes are taken for cube test and maintain record of the same, i.e.,

casting date & testing date.

21) Ensure safety at site by enforcing PPEs and MGL life savers rule.

22) Check measurement on daily basis as per MGL format.

23) To work out excess/saving quantities against PO quantity.

24) To record measurements with diagrams/sketches of site activities on daily basis jointly

with contractor on measurement sheets and submit the same to MGL engineer.


Interested candidates can share their resumes on recruiter4@kushalengineers.com

Connect on - 022-41556171

WP - 8108797259

Mock Interview

Practice Video Interview with JobPe AI

Start Project Management Consultancy Interview Now
cta

Start Your Job Search Today

Browse through a variety of job opportunities tailored to your skills and preferences. Filter by location, experience, salary, and more to find your perfect fit.

Job Application AI Bot

Job Application AI Bot

Apply to 20+ Portals in one click

Download Now

Download the Mobile App

Instantly access job listings, apply easily, and track applications.

coding practice

Enhance Your Skills

Practice coding challenges to boost your skills

Start Practicing Now

RecommendedJobs for You

Beed, Akola, Amravati, Hingoli

Srinagar, Jalgaon, Rourkela, Ahmedabad, Jammu