Hi,
About the Role : Shift Lead
Role Objective:
Having knowledge about operation and maintenance at data center and its critical equipments such as
Transformer DRY & OIL type, RMU, VCB, ACB, D.G Set, PDU, Battery Banks, UPS and all other switchgears etc.Commissioning, maintenance and troubleshooting of HT & LT system
, APFC PANELs for power factor correction. Protective Relays likes O/C, E/F, and O/V, U/V with all safety interlocks.Having knowledge in HVAC system water cooled technology of Chiller
- 500TR-1000TR, Cooling tower, Primary Pumps, Secondary Pumps & Condenser Pumps, PAC (precision air conditioning), CRAH Units (UP to 50 TR), AHU, FCU, CSU, Air washer, Dehumidifier’s, VRF & split AC Units.Managing & Monitoring Firefighting system
–FM200, Novec 1230, Smoke Detectors, Fire Control Panel, RI, handhold fire extinguisher cylinder, Hydrant & Sprinkler system.Monitoring & maintaining IBMS System
- Power, Cooling, CPM, WLD, VESDA, Rodent Repellant System, Gas Suppression system, CCTV, ACS (Access Control System), PAS (Public Address System).Plumbing W.T.P.
(MGF, ACF, Softeners and R.O. Plant- 2*30 KL), STP.Monitoring
& Maintaining
of PUE, WUE & CUE.- Planning for new equipment’s installation.
- Overall supervision of Building maintenance work and handling all complaints-related issue.
- Maintaining all files and formats Daily/Weekly/Monthly/Annually Reports & presenting to management.
- 100 % preventive maintenance of all engineering equipment’s to minimize breakdowns & reduction in R & M cost & Coordination with vendors to rectify the fault as per SLA.
- Preparing root cause analysis for regular breakdown.
- Internal Audit and verification of sites & ensuring that all certificates of compliance are maintained and up to date in accordance with relevant legislation
- To ensure cost optimization-Track & review monthly cost of operation. Resource optimization.
- Ensure billable space optimization, Ensure billing accuracy to be achieved to 100%
- To ensure DC hosting renewals are happening well in time
- Service Delivery-100% uptime of DC, Uptime and availability of AHU, UPS, Power and Security systems. 100%
- Service Delivery: customer-100% service availability
- Transition-New customer provisioning withing project plan-100% (Track OB- Invoice cycle management)
- Customer relationship-Ensure communication to customer on relevant issues, meeting customers as needed by business & for service delivery . 100%
- Internal projects-Site specific internal infra new project management,
- Ensure all PSS and projects plans are being prepared and shared with customer on time .
- Ensure Customer Audits-Audit compliance are 100% success and meets their requirements
- Ensure all business teams are getting support-Assist/support business (customer visits & RFP response), Presales and Product team, 100%
- Process Compliance-Periodic maintenance of DC components as per BCP Ensure updation and maintenance of all records and reports as per process guide lines 100%
- Ensure timely delivery and sharing of MIS-Monthly ,DCCP with management and review if required by management
- Ensure SLA Maintenance - Incident & Problem management Ensure calls are getting attended & SLA met Ensuring proactive and timely support to reduce calls month on Month basis (Zero TAC for Sify Infrastructure related problem). 100%
- Ensure process Upgrade/improvement-Identification of need for process improvement and implementation. Regular process review, act upon internal audit findings.
- Ensure process Compliance-Adhering to ISO 27001, ISO 9001, ISO 20000 standards, PCIDSS ISO 45K etc
- Ensure vendor management-Contract utilization & review are being carried out regularly
- Ensure knowledge enhancement (Technical as well as Soft skill)for self and team members Periodic training within the team. Set directions for training criteria for each associate
- Mentoring-Periodic team meeting, empower and motivate team.
- Succession Planning-Succession planning for key associates
- Employee Development-Certification Self & team members
If you are interested in above opportunity, then please share your updated profile for further discussion along with following details.
Total Experience:
Relevant Experience:
Current CTC:
Expected CTC:
Notice Period:
Thanks & Regards
Leena Jadhhav
HR Manager
Email: leena.jadhhav@sifycorp.com